BOOK BEFORE YOU COME – charters and cruise days can change our timetable

History of the Bay of Islands Vintage Railway

Some places make you feel time. Kawakawa is one of them – because here, the railway isn’t tucked away behind fences. It runs right through town, down State Highway 1, like it always belonged there.

 

The Bay of Islands Vintage Railway is proud to operate on the oldest passenger railway line in the North Island (established 1867) – and today it’s a living, working heritage corridor where history, scenery and community all ride together. It’s one of Northland’s most iconic heritage experiences, and one of the most unique things to do in the Bay of Islands.

Where it all began: coal, community, and the first rails (1864–1867)

This story starts with the discovery of coal in Kawakawa in 1864, and the need to move it efficiently through the region. By 1867, the Kawakawa to Taumārere tramway was established – laying the foundations for what would become one of Northland’s most iconic rail experiences.

If you’ve ever wondered why the railway feels so tied to the landscape here, that’s why: it was built to connect people, industry and the water’s edge – and the corridor still follows that same natural logic today, winding through farmland, rivers and wetlands towards Ōpua.

The link to the coast: from Kawakawa to Ōpua (1884)

As the line evolved, it pushed east – and in 1884, the rail link to Ōpua opened.

That coastal direction still shapes the experience now: you leave town, pass into open country, then follow the riverscape through the Bay of Islands environment – the same corridor the railway describes as a patchwork of salt marsh, raupō swamps, coastal wetlands and remnant forest.

The landmarks that make this railway legendary

The train down the main street
This is the moment everyone talks about – because it’s genuinely rare. BOIVR is the only working railway in New Zealand that runs down the middle of a State Highway, right through the heart of a busy town.

Long Bridge, Taumarere

Out along the line sits one of the railway’s proudest engineering features: Long Bridge is the longest curved wooden rail bridge in the Southern Hemisphere.


From the train’s viewing areas, it’s a proper “slow down and stare” moment – river below, wetlands stretching out, and that feeling of travelling through another era.

Whangae Tunnel (1880–1884)

The Whangae Tunnel is the oldest rail tunnel in the North Island of New Zealand, built with hand-made bricks made onsite between 1880 and 1884.

 

Today, the railway’s restored track allows visitors to reach the Whangae Tunnel Platform as part of the extended scenic journey.

A railway that’s alive again: restoration and the modern experience

This isn’t a museum piece – it’s a working heritage railway that’s been steadily brought back to life, offering one of the most scenic train journeys in the North Island through major restoration mahi (work).


The corridor has undergone extensive upgrades, and the extended two-hour railway experience along the Taumārere River opened in October 2024, following significant restoration works (including vintage engines and carriages), with support across the 2021–2024 period.


On today’s ride, the railway leans into what makes it special:

  • a 120-minute scenic return journey from Kawakawa towards Whangae Tunnel Platform

     

  • closed and open carriages, plus space for standing and bicycles

     

  • onboard storytelling from guards covering local history, environment and culture

     

  • the chance to spot rare and endangered birds along the wetlands and riverscape

 

It’s the kind of experience that feels nostalgic without being staged – the “click-clack” of wheels, the slow pace, the landscape opening up around you.

The people behind the railway (and the corridor it protects)

BOIVR is operated by Keteriki Ltd, a charitable entity established to operate the railway as a joint venture with Ngā Tangariki o Ngāti Hine.

And the corridor itself is treated as more than “track” – we have a wider vision for a biodiversity corridor, with predator control efforts along the line to protect wetland habitats and species (including threatened birdlife).

That mix – heritage + community + kaitiakitanga (guardianship/stewardship) – is a big part of why this railway matters.

Looking ahead: getting closer to Ōpua

Ongoing fundraising and planning is underway for the final stages of restoration, including Whangae Tunnel work and the final stretch of track recovery towards Ōpua.

Because this history isn’t finished – and the goal is one of New Zealand’s great journeys, running all the way to Ōpua, sleeper by sleeper.